≥1 piece |
Product Description
MACARONI pasta production line
Product description;
Pasta production line adopt Potato Starch ,potato powder and corn starch as the main materials ,to produce a variefy of twice extrudsion in different shapes,which are popular in the markets,such as crusp pea,shell,screw ,square tube,round tube,and wave.
This line is characterized by uniques technique, rational configuration, high atuomation and stable performance. It can finish steaming ,extrusion and shaping in one step without boiler. With high automation ,small floor space and without boiler. The driving devices make use of inverter to adjust speed.
Raw materials:
Pasta machine adopts potato starch, potato powder and corn starch as main materials to produce potato chips, potato sticks and other shapes, only by changing of molds
Pasta shapes:
This Pasta machine can Produce a variety of twice extrusion ones in different shapes, which are popular in the market, such as crisp pea, shell, screw, square tube, round tube and wave.
Advanced technology:
This Pasta make machine is characterized by unique technique, rational configuration, high automation and stable performance.
Processing method:
This Extruded fried snacks food machine can finish steaming, extrusion and shaping in one step without boiler, with high automation, small floor space.
Our Services
Our skilled engineer will go to your country to teach the workers operate machine.
1. We make accurate factory layout design according to customer's factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker's restroom, etc.
2. After delivering machines to client's factory, we start to apply for the Visa to client's country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 7 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
Model |
Installed Capacity |
Actual Consumption |
Main Power |
Throughput |
Dimension |
YL65- III | 34kw | 28kw | 22kw | 120-150kg/h | 2400*1200*1800 |
YL70- II | 42kw | 30kw | 30kw | 160-200kg/h | 2600*1200*1800 |
YL85- III | 92kw | 75kw | 75kw | 400-500kg/h | 4500*1600*2000 |
YL-100 | 55kw | 30kw | 38kw | 80-100kg/h | 3200*1500*2000 |