| ≥1 piece |
CG-300L of Beer brewery equipment in hotel
Steam heating
Simens PLC control
5 Years warranty
19Years experiences
CG-300L of Beer brewery equipment in hotel
We are a well established manufacturing entity of the global beverage equipment industry, comprehending the growing needs of quality brewery; we commenced our operations in the year 1995.
Since our inception, we have been endeavoring to provide a world class of beer equipment to our esteemed clientele, leveraging on our rich industry experience and market understanding, we have established ourselves as the leading manufacturer.
1:TECHNOLOGY DETAILS FOR EQUIPMENT
| Mash kettle boiler 300L | 1 piece. Interior: Stainless Steel, with stir,steam heating |
| lauter/whirlpool Tank 300L | 1 piece.Interior: Stainless Steel, with stir |
| fermentation tank :600L | 8 pieces.Stainless steel, one control for each tank |
| Ice water tank:1000L | 1 piece,Stainless steel |
| Sterilizing trolley: 100L | Washing Pump: flow 3t/h, pump head 18m |
| Refrigerating | 6000cal, 2 groups |
| Malt mill machine | 300Kg/h ,1 piece |
| Plate heat exchanger | Exchanger 6m 2 |
| Wort pump: Flow 5t/h, 1 pcs, | Pump head 25m,equipped between Mash&lautering Pipeline |
| Ice water pump 1000L | Flow 4t/h, pump Lift 20m,1 piece, Centrifugal Type |
| Control cabinet | 1 set, including power, fermentation, refrigeration, etc. |
| Control cabinet | 1 set, including power, fermentation, refrigeration, etc. |
| Mash technological pipeline | 1 set , Stainless steel |
| Ice water pipeline | 1 set, PPR |
| 25 Food tube: 20m, 1 piece | Equip32/25 stainless steel connectors and pipe strap |
| 32 Wire tube: 1.5m, 1 piece | Equip32 stainless steel connectors and pipe strap |
| Wort thermometer | 0-100, 1 piece, Stainless steel |
| Cross joint | Dg32, 1 set, Used at wort exit of Heat Exchanger |
| Dg25/32 transfer | 1 piece, Stainless Steel, double thread |
| Specially Operating spanner | 2 pieces |
| Measuring cylinder | 1 piece |
| Lees out harrow | 1 piece |
| Aerator | 1 set |
| Saccharometer | 10-20°, 4 pieces; 0-10°,4 pieces. |
| Rubber seals: 30 pieces, | Dg40/32/25, Equipped as per the proportion of 8/20/2 |
2:TRADE TERM
| Equipment of discription | Mash kettle boiler,Fermention tank,whirlpool/lauter tun.etc. |
| Trade term | FOB or EXW |
| Delivery time | 25-35days,based on the capacity of equipment |
| Payment term | T/T |
| Port of loading | Qingdao,CHINA |
| MOQ | 1 pcs,the more the suitable in quotation |
| Package | Steel frame or exporting stardand wooden case,or up to you |
| Supplying ability | 90-100pcs per years,basde on the capacity |
| Services | 1-3years after-sales services for our products |
| Capacity | 100-2000L,according to clients requests an production |
3:MORE PICTURE AS FOLLOWS
Jinan China-Germany Brewing Co,Ltd
Legal Address:Huanxiangdian Section,Hehua Middle Road Licheng District Jinan Shandong,China.
Ph:0086-531-88010556
0086-1335 6686 221
Skype:danny.zhang8
| Processing: |
Fermenting Equipment,Argon arc welding
|
Condition: |
New
|
Place of Origin: |
Shandong China (Mainland)
|
| Brand Name: |
CGBREW-CHINA
|
Model Number: |
CG-3HL
|
Processing Types: |
Alcohol
|
| Voltage: |
220V,380V
|
Power(W): |
35Kw
|
Dimension(L*W*H): |
Need one piece 20'FCL
|
| Weight: |
1~3Tons
|
Certification: |
CE,ISO9001:2008
|
Warranty: |
36 Months
|
| After-sales Service Provided: |
Engineers available to service machinery overseas
|
Model: |
CG-300L of Beer brewery equipment in hotel
|
Mrterial: |
Stainless steel
|