Product > Food Processing Machinery > 

CG-300L of Beer brewery equipment in hotel,China CGBREW-CHINA price supplier

CG-300L of Beer brewery equipment in hotel
min.order / fob price
≥1 piece
OriginShandong China
Production Capacity90 Unit/Units per Month Years
CategoryFood Processing Machinery
Update Time2022-06-10
company profile
Jinan China-Germany Brewing Co., Ltd.
China
Contact: Ms.Ms. Danny Zhang
Tel: 86-0531-88010556
Number of Employees: 11 - 50 People
Business Type: Manufacturer, Trading Company
product details
Model No:CG-3HL
Origin:Shandong China
Brand:CGBREW-CHINA

CG-300L of Beer brewery equipment in hotel
Steam heating
Simens PLC control
5 Years warranty
19Years experiences

 

CG-300L of Beer brewery equipment in hotel

 

   We are a well established manufacturing entity of the global beverage equipment industry, comprehending the growing needs of quality brewery; we commenced our operations in the year 1995.

   Since our inception, we have been endeavoring to provide a world class of beer equipment to our esteemed clientele, leveraging on our rich industry experience and market understanding, we have established ourselves as the leading manufacturer.

1:TECHNOLOGY DETAILS FOR EQUIPMENT

Mash kettle boiler 300L

1 piece. Interior: Stainless Steel, with stir,steam heating

lauter/whirlpool Tank 300L

1 piece.Interior: Stainless Steel, with stir

fermentation tank :600L

8 pieces.Stainless steel, one control for each tank

Ice water tank:1000L

1 piece,Stainless steel

Sterilizing trolley: 100L

Washing Pump: flow 3t/h, pump head 18m

Refrigerating

6000cal, 2 groups

Malt mill machine

300Kg/h ,1 piece

Plate heat exchanger

Exchanger 6m 2

Wort pump: Flow 5t/h, 1 pcs,

Pump head 25m,equipped between Mash&lautering Pipeline

Ice water pump 1000L

Flow 4t/h, pump Lift 20m,1 piece, Centrifugal Type

Control cabinet

1 set, including power, fermentation, refrigeration, etc.

Control cabinet

1 set, including power, fermentation, refrigeration, etc.

Mash technological pipeline

1 set , Stainless steel

Ice water pipeline

1 set, PPR

25 Food tube: 20m, 1 piece

Equip32/25 stainless steel connectors and pipe strap

32 Wire tube: 1.5m, 1 piece

Equip32 stainless steel connectors and pipe strap

Wort thermometer

0-100, 1 piece, Stainless steel

Cross joint

Dg32, 1 set, Used at wort exit of Heat Exchanger

Dg25/32 transfer

1 piece, Stainless Steel, double thread

Specially Operating spanner

2 pieces

Measuring cylinder

1 piece

Lees out harrow

1 piece

Aerator

1 set

Saccharometer

10-20°, 4 pieces; 0-10°,4 pieces.

Rubber seals: 30 pieces, 

Dg40/32/25, Equipped as per the proportion of 8/20/2

2:TRADE TERM   

Equipment of discription        Mash kettle boiler,Fermention tank,whirlpool/lauter tun.etc.      
Trade term FOB or EXW
Delivery time 25-35days,based on the capacity of equipment
Payment term T/T
Port of loading Qingdao,CHINA
MOQ 1 pcs,the more the suitable in quotation
Package Steel frame or exporting stardand wooden case,or up to you
Supplying ability 90-100pcs per years,basde on the capacity
Services 1-3years after-sales services for our products
Capacity 100-2000L,according to clients requests an production

3:MORE PICTURE AS FOLLOWS

 

Jinan China-Germany Brewing Co,Ltd

Legal Address:Huanxiangdian Section,Hehua Middle Road Licheng District Jinan Shandong,China.

Ph:0086-531-88010556

 0086-1335 6686 221

Skype:danny.zhang8

Processing:
Fermenting Equipment,Argon arc welding
Condition:
New
Place of Origin:
Shandong China (Mainland)
Brand Name:
CGBREW-CHINA
Model Number:
CG-3HL
Processing Types:
Alcohol
Voltage:
220V,380V
Power(W):
35Kw
Dimension(L*W*H):
Need one piece 20'FCL
Weight:
1~3Tons
Certification:
CE,ISO9001:2008
Warranty:
36 Months
After-sales Service Provided:
Engineers available to service machinery overseas
Model:
CG-300L of Beer brewery equipment in hotel
Mrterial:
Stainless steel
You Might Also Like
 
Post Sourcing RequestContact Supplier