| ≥1 piece |
Detailed Product Description
Processing methods:
1) All the live materials are arranged to factory: open the shell, take off frill
2) Wash by purified sea water, remove admixtures
3) Products disinfected and quickly frozen with 2kg per block
4) It only takes 4 hours from catching materials to storing ready products
Outer packing:
16kg/ctn