Product > Feeding Machine > 

K- type Reciprocating feeder,China price supplier

K- type Reciprocating feeder
min.order / fob price
≥1 piece
OriginXINXIANG HENAN CHINA
Production Capacity10 000PSC/YEAR
CategoryFeeding Machine
Update Time2011-12-22
company profile
Xinxiang Constant Far Vibration Machinery Co., LTD
China
Contact: Mr.Asa
Tel: 86-0373-3528671
Number of Employees: 50 ~ 100
Business Type: Manufacture & Trade
product details
Model No:K-0
Standard:ISO9001
Origin:XINXIANG HENAN CHINA

type t o use reciprocating feeder

K type reciprocating to plow coal or other used for grinding cut small, the sticky small of loose particulate material feeding, will store silo pit or material of raw material continuously evenly discharge to transport equipment, or other screening equipment. 

Working principle

K type coal to the frame, floor (to coal troughs), transmission Platform, number one   the leakage, roller composition, when motor start by elastic coupling, deceleration machine, crank rod system of the floor tilt drag 5 degrees in roll a straight line reciprocating motion, evenly to other coal unloading equipment

This machine can according to need with and without a funnel funnel two forms. 

With two structures to plow form:

 1 :  not with adjusting the gate with regulating valves,

2:  the feeding capacity by adjusting to the gate. 

K type reciprocating feeder technology parameter table

Type

K-0

K-1

K-2

K-3

K-4

motor

 type

Y160M-8

Y160M-8

Y160M-8

Y160M-6

Y180L-6

Power / kw

4

4

4

7.5

15

 rotate speed   r/min

750

750

750

970

975

reducer

type

ZQ350

ZQ350

ZQ350

ZQ400

ZQ500

 Equipment method

Ⅶ-3Z

Ⅶ-3Z

Ⅶ-3Z

speed ratio

12.635

12.635

12.635

15.75

15.75

Largest size  content / mm

Below 10%

250

350

400

500

700

More than 10 %

200

300

350

400

550

Weight / kg

Take hopper

1150

1253

1421

1973

2880

Without  t he hopper

1077

1156

1286

1830

2677

K type reciprocating feeder installation and use

1. Reciprocating feeder is fixed on the storage bin, in mouth before installation needs to be sure level, will frame and warehouse mouth bolt, then the transmission platform in the correct position, H form frame and the frame, transmission platform welding firm, deceleration machine, motor is installation, adjustment for proper, the bolt.

2. After installation to empty load test, operation, check the components of work is normal, rolling bearing maximum temperature rise no more than 60  .

3. According to unloading requirements, adjust productivity will crank parts pin shaft pull out, loose, and turn the nut shell of crank position "1, 2, 3, 4" select fixed, will pin shaft insert, connect with the crank and crank crank shell, tighten pin shaft and nuts, and the drive. After the adjustment

You Might Also Like
 
Post Sourcing RequestContact Supplier