| ≥1 piece |
Main Technical Parameters:
1. Output: 150-200KG/H
2. Size: 50-70me sh (normal required size, feed inlet less than 10mm)
3. The total power: 16.6 KW, 380V, 50HZ, 3 phase.
The voltage: 380V, 50HZ (based on customer requirement)
Weight about 1.3t bulk 7 m3
4. The size of workshop. It needs a workshop; the length of the workshop is 5m.
The span is 3.5m, the height is 3.5m.
5. Man power requirement: 1 person.
Work Theories and Usage:
The 2 pairs of rollers will press and shear to the raw materials, which will get to the final powder goal. The materials discharged from the rollers will enter to the prolonged cylinder to sift. The qualified mesh powder will be packed, and the unqualified powder will be sent to the roller again by the auger automatically.
Installation:
Installed the mill body (inlays 2 pair of rollers) on the bottom case, and then put the transparent hopper on the top. Fix the cone hopper under the bottom of the mill body, and then connect the pipe and cyclone. Put the wind stopping device under the cyclone, the under month of the wind stopping device will connect with the inlet of the cylinder sieve. Then put the cylinder sieve connect with the auger cone hoper, and put the auger upper hopper connect with the cone hopper.
Preventive Maintenance:
Keep hands out off the rollers.
The rollers are not allowed to contact directly.
Overloaded running prohibited.
If there were too low powder yield, please check if the cylinder sieve were blocked or not. You can use the brushes to clear if the sieve was blocked.
Pls let me know your output then I will recommand the suitable model of the machine, the quotation, and the working condition of the machine to you soon.